GTN
currently sells capacity on three paths, including its full-haul
path Kingsgate to Malin, and two paths within the full haul, which
are Kingsgate to Stanfield and Stanfield to Malin. The current available
capacity at each of these receipt and delivery points is as follows:
/1
GTN will consider requests for capacity for individual or multiple
months within this date range and will award capacity on a non-discriminatory
basis.
All currently available Long-Term Firm capacity may be sold on a
prearranged basis.
Available capacity on the Stanfield-to-Malin path includes primary
firm receipt rights at Stanfield for gas sourced from GTN's system.
Some of the Stanfield-to-Malin capacity available for sale does
not include primary receipt rights at Stanfield for gas sourced
from Williams' Northwest Pipeline's system. In the event that GTN
must limit volumes through the Stanfield compressor, that capacity,
if nominated off Northwest Pipeline, will be scheduled with a priority
equal to all other firm service nominations with secondary receipt
point rights.
Back haul capacity is provided by displacement and is available
up to the amount of scheduled forward-haul capacity through a specific
point. Reverse path transactions will be made available on a secondary
firm basis consistent with paragraphs 1.32 and 18.1 in the General
Terms and Conditions of GTN's Tariff.
Please
call the following Account Representatives if you have any questions.
San Francisco: |
Bevin
Hong |
925.200.1476 |
Calgary: |
Randy
Hunter |
403.531.8223 |
Houston:
|
Jim
Schoene |
713.371.6524 |
Portland:
|
Dave
Sloan |
503.833.4358 |
|