GTN's downstream
interconnect, PG&E's California Gas Transmission (CGT), is
changing contract naming conventions on November 8 th . To ensure
that GTN and CGT are able to match upstream/downstream contracts
at the Malin interconnect, please follow these guidelines when
nominating on GTN:
- For the entire Gas Day November 8th , use the
old CGT contract naming convention on your GTN nominations to/from
CGT at Malin. Even though CGT's INSIDETRACC will report using
the new contract naming conventions on the CGT system starting
with the intraday for Gas Day November 8, GTN will continue
to use the old naming convention through the end of the day
to eliminate EPSQ issues.
- Beginning with the Timely Cycle for Gas Day
November 9th , GTN shippers nominating to/from CGT at Malin
should use CGT's new naming convention for the downstream/upstream
contract. Shippers may submit nominations for November 9th in
advance of that date.
If you
have any questions or concerns regarding GTN nominations that
include transactions between GTN and CGT at the Malin interconnect
during this transition, please call a GTN transportation coordinator
at 503-833-4300, option 1.
Questions
for CGT should be directed to the CGT scheduling hotline at 415-973-2424.
CGT's new
naming convention is detailed in documentation on the CGT Pipe
Ranger website
http://www.pge.com/pipeline/services/insidetracc/new_nom_screens/PoolCodes.doc